Qinfeng Compactor Machinery can provide you with Styrofoam Compactor/EPS Compactor/Foam Compactor/EPS Hot Melting Machine/EPS Melter/Foam Hot Melting Machine

News /

Maintenance of Styrofoam Compactor

Waste plastic styrofoam compactor in the operation, maintenance and maintenance of waste plastic styrofoam compactor, and this maintenance and maintenance should also be operated according to certain regulations, which is conducive to the operation of mechanical equipment, and at the same time according to the relevant requirements of the corresponding equipment safety technical performance. To maintain, it can effectively guarantee the maximum safety of equipment and personnel.
1. Delivery and maintenance of waste plastic styrofoam compactor
When the waste styrofoam compactor is in normal operation, it shall be carried out in accordance with the rules and regulations, daily and regular maintenance, regular maintenance, and several maintenance and repairs of the mechanical equipment during the specified time to clean, lubricate, adjust and disintegrate. Maintenance is carried out for the center content. Daily maintenance is mainly responsible for cleaning, fastening, lubrication, adjustment, and anti-corrosion. This is checked every day.
2. Inspection before equipment installation
The waste styrofoam compactor is also composed of various components. Before installation, check the individual equipment components, check the main steel structure, bearings, bolts, etc., and whether the surface condition of the parts is anti-corrosion, etc. A record for later testing.

Styrofoam Compactor
3. Conditions before the overhaul of the waste styrofoam compactor
The overhaul of the equipment means that the damage of the equipment is very serious or the damage is very serious, and the mechanical performance is significantly degraded. At this time, the overhaul is carried out, such as the mechanical performance of the machine is significantly reduced, the fuel consumption is increased, the operation is not working, and the sound is abnormal. Or a comprehensive and thorough recovery repair method under the condition that the equipment can no longer perform normal production performance. At this time, the overhaul should be carried out according to the regulations, and the progress of the work should be arranged at the same time.
4, the retirement of equipment
In the process of overhaul, there will be the possibility of scrapping, and the maintenance professional will be responsible for the implementation. There must be records and acceptance. For equipment that exceeds and is close to the end of life, a certificate of overhaul acceptance should be provided before installation, and a record of scrapping should be made at the same time.